HomeSignal · City development
Development in Kennewick, WA
10 distinct development projects on file across the 3 ZIP codes named Kennewick. A project that appears in more than one of these ZIP codes is counted once.
Project types
- Roads & infrastructure 10
Where projects stand
- Operating / built 7
- Proposed 2
- Approved 1
Recent projects
- US 395/Kennewick Vicinity - Variable Speed Zone Install variable speed zone Roads & infrastructure · Approved ZIP 99336
- US 395/Pioneer Memorial Bridge - Bridge Painting Stage 2 Paint Bridge 395/40 Roads & infrastructure · Operating / built ZIP 99336
- SR 397/E Bruneau Ave - Railroad Crossing Improvements Install cantilever-mounted beacons - Xing #808925X Roads & infrastructure · Operating / built ZIP 99336
- US 395/Ridgeline Drive - Construct Interchange Construct interchange Roads & infrastructure · Operating / built ZIP 99337
- SR 240/I-182 to US 395 Basic Safety - Guardrail Preservation Upgrade guardrail Roads & infrastructure · Operating / built ZIP 99336
- US 395/10th Ave to I-182 Safety Features -Roadside Hardware Upgrade guardrail Roads & infrastructure · Operating / built ZIP 99336
- US 395/BNSF & UP Railroad & Canal Bridges - Joint Repair Expansion joint and strip seal replacement - Bridge 395/14E & 3 Roads & infrastructure · Operating / built ZIP 99336
- US 395/W Kennewick Ave to I-182 Bridge - ADA Compliance Upgrade existing curb ramps to meet ADA Compliance Roads & infrastructure · Operating / built ZIP 99336
- SR 397/I-82 to 0.6 Miles S of Sloan Road - Paving Grind and repave HMA Roads & infrastructure · Proposed ZIP 99337
- US 395/Kennewick - W 19th Ave Noise Walls Install noise walls Roads & infrastructure · Proposed ZIP 99336
ZIP codes are grouped by the place name on their HomeSignal page, which follows the postal name and can differ from city limits. Compiled from official public records on . Every project links to its source record; nothing on this page is generated or inferred.