Development projects on record in 84405 · Ogden (84405), UT
10 projects, newest first.
- I-15 31st St Interchg SB on-ramp meter FROM SR-79 31ST STREET; MP .28 - .28 FROM SR-79 31ST STREET; MP .28 - .28 Roads & infrastructure · Proposed
- 2700 E & SR-60 Widening for Left & Right Turn Lane 2700 East; South Weber Drive to 7800 South 2700 East; South Weber Drive to 7800 South Roads & infrastructure · Proposed
- UTN: Harrison Boulevard Trail Gap (Study) Trail project off-system located along Harrison Blvd in Ogden Trail project off-system located along Harrison Blvd in Ogden Roads & infrastructure · Proposed
- I-84; Uintah Jct to Echo Jct Bridge R&R I-84; MP 88.77 - 119.76 I-84; MP 88.77 - 119.76 Roads & infrastructure · Proposed (no longer tracked)
- UTN: Hill AF Base Three Gate Trail - Study Trail Study (separated from roadway) Trail Study (separated from roadway) Roads & infrastructure · Proposed
- 40th; Riverdale to Washington Cnty:FA-3354; MP .00 - .47 Cnty:FA-3354; MP .00 - .47 Roads & infrastructure · Approved
- Riverdale Road Interchange Concept SR-26; MP .20 - .50 SR-26; MP .20 - .50 Roads & infrastructure · Operating / built
- Various Locations, WWD Ramp Upgrades SR-67; MP .00 - 11.50 & SR-67; MP .00 - 11.50 & I-84; MP .00 - 112.10 & I-84; MP .0 SR-67; MP .00 - 11.50 & SR-67; MP .00 - 11.50 & I-84; MP .00 - 112.10 & I-84; MP .00 - 112.10 & I-15; MP 315.00 - 400.00 & I-15; MP 315.00 - 400.00 Roads & infrastructure · Approved
- I-84 Bridge Corridor Asset Management Study I-84; MP 88.95 - 119.96 I-84; MP 88.95 - 119.96 Roads & infrastructure · Operating / built
- Bridge Deck Preservation; Delayed Polymer Overlay POCATELLO/VALLEY - OVERPASS; MP .00 - .28 & BOTHWELL INT. - OVERPASS; POCATELLO/VALLEY - OVERPASS; MP .00 - .28 & BOTHWELL INT. - OVERPASS; MP .00 - .12 & SR-102; MP 14.09 - 14.40 & Cnty:FA-1508; MP .64 - .80 & I-84; MP 90.50 - 91.19 Roads & infrastructure · Proposed