Development projects on record in 89509 · Reno (89509), NV
8 projects, newest first.
- Reno Storm Drain Easement Abandonment The application is for abandonment of an existing storm drain easement in favor of The application is for abandonment of an existing storm drain easement in favor of a relocated storm drain easement which is necessary to allow the development of the site with multi-family residential apartments as part of the Sierra Senior Center Care Planned Unit Development. The existing 15" storm drain will be reconstructed within the proposed, relocated easement. Roads & infrastructure · Proposed
- Brink Residence Addition Brink Residence Addition Brink Residence Addition Other project · Proposed
- Reviglio Remodel Sidewalk Waiver Reviglio Remodel Sidewalk Waiver Reviglio Remodel Sidewalk Waiver Other project · Proposed
- Lakeside McCarran Blvd (consult) Washoe Roads & infrastructure · Operating / built
- B1530 Truckee R at Keystone Washoe Roads & infrastructure · Operating / built
- G1864 Truckee R at McCarran Washoe Roads & infrastructure · Operating / built
- 2nd St Air/Water Separator Washoe Roads & infrastructure · Operating / built
- I580 WA22.563-WA25.002 Washoe Roads & infrastructure · Operating / built