HomeSignal · Development project
BRANDON-MIDDLEBURY State Hwy Pavement, Rehabilitation
Paving on US 7 from Brandon MM 4.72 to Middlebury MM 5.698., Brandon (05733), VT
Roads & infrastructure · Approved as of
On the record
- Address
- Paving on US 7 from Brandon MM 4.72 to Middlebury MM 5.698.
- Type
- Roads & infrastructure
- Where it stands
- Approved
- Status as of
- Record number
- NH PS31(2)
- Source
- Vermont Agency of Transportation (VTrans) (vtrans-project-locations-lines)
- Official record
- View the source record
Where it is
On the HomeSignal page for these ZIP codes:
More projects in these ZIP codes
- PITTSFORD Roadway, Roadbed Reconstruction RECONSTRUCTION OF US7 IN PITTSFORD, SEGMENT 3: BEGINNING APPROX. 2.395 KM NORTH OF THE VT3 INTERSECTION AND EXTENDING NORTHERLY 3.694 KM. WORK INCLUDES WIDENING, FULL SUBBASE RECONSTRUCTION, DRAINAGE, ETC. Roads & infrastructure · Approved
- MIDDLEBURY Traffic & Safety, General Scope refinements to improvement to the intersection of US7/Monroe and US7/Charles in Middlebury. Roads & infrastructure · Approved
- MANCHESTER-MIDDLEBURY Traffic & Safety, Signs Sign replacement on VT 30 from Manchester ETE 39.474 to Middlebury ETE 105.454 minus class 1 sections. Roads & infrastructure · Approved
- MIDDLEBURY Bike & Ped DESIGN AND CONSTRUCT APPROX. 775 FEET OF SIDEWALK AND CURBING, AND 2,045 FEET OF SHARED-USE PATH ON EXCHANGE STREET. Roads & infrastructure · Approved
- BRANDON Transportation Alternatives Replace 1500' non-ADA compliant asphalt sidewalk on both sides of Union St within the designated Downtown. Roads & infrastructure · Approved
Status as of , from Vermont Agency of Transportation (VTrans)'s public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.